top of page

Completed Projects
Completed
Projects

![]() KING ABDULLAH FINANCIAL DISTRICT (SUBTERRANEAN ROAD AND UTILITY TUNNELS)Client: KAFD Contractor: JLL Consultant: KEO Scope ofWork: ‣ The Project consists of three areas namely Subterranean road, Tunnel 1C and Tunnel 1B ‣ The Scope is Supply and Installation of Electrical and Mechanical Work. ‣ Project Duration: 10 months | ![]() WORLD DEFENSE SHOW 2022Client: SELA Contractor: Saudi Architects BID01 & BID02 Scope of Work: ‣ Construction of structural steel sheds for parking area ‣ Construction of Storm Drainage System and surface drainage ‣ Construction of ponding areas ‣ Construction of Potable water Distribution systems, Fire water system, irrigation network, sanitary waste water collection ‣ Construction of Site electrical duct banks for mv `& lv cables ‣ Street lighting works ‣ Plant rooms and electrical rooms ‣ Bulk excavation | ![]() ABHA REGIONAL AIRPORTClient: General Authority for Civil Aviation (GACA) Contractor: ICAD Consultant: Dar Al Handasah Scope of Work: ‣ Air Handling Units, Ventilation/Exhaust Fans, split units,Ducting specialties, air outlets ‣ Drainage/Rain-water/ Plumbing System ‣ Fire Protection (Sprinklers, FHCs, Fire Extinguishers) ‣ BMS related to fire fighting works monitoring, HVAC control & monitoring ‣ Earthing & Lightning System ‣ LV cables, races, boxes, fittings, lighting outlets, switches, sockets | ![]() JEDDAH YACHT CLUBClient: SELA Contractor: MBL Consultants: ACC Scope of Work: Supply, Installation of: ‣ Lighting fixtures, switches, LV cables, MDB, panels, UPS and AHU MCCs. ‣ Ducting works, chiller units, chilled water pumps, chilled water AHUs, FAHUs, Makeup Air Units, Exhaust fans, Generator Fans, FCUs, Expansion tanks, Pressurization units ‣ Fire fighting system ‣ Drainage and Water Supply Systems |
---|---|---|---|
![]() KING ABDUL AZIZ INTERNATIONAL AIRPORTClient: General Authority for Civil Aviation (GACA) Contractor: SBG Consultant: Dar Al Handasah Scope ofWork: ‣ Full MEP scope for 68 UPS Rooms Communication Pathways containment Works ‣ MV Cable pulling at Utility Tunnel ‣ Earthing Cabling for MV Network with all related fittings and accessories ‣ HDPE Inner duct, Cable rack support for communication manholes ‣ Full MEP scope for Communication Rooms (189 Rooms) ‣ Cable Ladder installation sizes 300mm & 600mm at Utility Tunnel | ![]() NEOM BAY AIRPORTClient: General Authority for Civil Aviation (GACA) Contractor: Saudi Arabian Baytur Consultant: Dar Al Handasah Scope ofWork: ‣ UPS, Batteries & Racks ‣ Generator with MDB, EMDB, SMDB, USMDB, PP, LP & UPP ‣ LV Cables ‣ Disconnect Switches, Sockets, Electrical Outlet & Floor Boxes ‣ Lighting Fixtures ‣ Street Lighting Poles & Fixtures, Earthing and Lightening Protections ‣ Plumbing System ‣ Solar Panels and Storage Tanks ‣ Oil & Grease Interceptors ‣ Fire Fighting System | ![]() JAZAN REFINERY UTILITIESClient: ARAMCO Contractor: Consolidated Contractors Company CCC Consultant: ARAMCO Scope ofWork: ‣ Installation, alignment, hand-over of all electrical equipment such as MV / LV switch gear, MCC, Control & Distribution Panels Bus Cables ‣ MV, LV and control cable pulling, dressing and tagging ‣ LV and control cable glanding, termination and testing | ![]() KING ABDULLAH PORTClient: Ports Development Company Contractor: Huta Marine Consultant: AECOM Scope ofWork: Supply, Installation, Testing and commissioning of: ‣ Main Substation / Power Plant Control Room ‣ Cabling to switch gear for all 5 Substations ‣ Full MEP Works for supporting buildings ‣ Supply & Installation of MV & LV cabling, UPS & status monitoring system ‣ Testing & Commissioning of Cables (Hipot Testing) ‣ Testing & Commissioning of all related works & activities |
![]() ELEGANCE TOWERClient: Ministry of Transport Contractor: First Fix Consultant: Dar al Handasah Scope ofWork: ‣ Supply and Installation of MEP Systems ‣ Block works ‣ Demolishing Works | ![]() RED SEA WEEK EVENTClient: NEOM Contractor: MBL Consultant: Saudi Diyar Scope ofWork: Supply, Installation, Testing and commissioning of: ‣ MEP Works Related to Buildings inside the island ‣ Utility building (Powerhouse including Generator Rooms, Switchgear Rooms, Transformer Rooms, Fire Fighting Pump Room, Plumbing Pump Room & RO Plant) ‣ MEP Infrastructure work ( MV/LV Cables, Potable Water, Sewage, Fire and Irrigation underground pipes) ‣ MEP Works inside the power house ‣ Pumping station works ‣ Water features | ![]() STRATEGIC RESERVOIR, TAIFClient: SWCC Contractor: Al-Ayuni Investment and Contracting Company Consultant: Khatib Al Alami Scope ofWork: Supply, Installation, Testing and commissioning of: ‣ Piping works ‣ Welding and coating works ‣ Total 4km piping work with sizes ranging from 600 mmØ to 1800 mmØ Scope ofWork: ‣ Installation of piping works from 300mm to 2000mm ‣ Welding and coating works | ![]() KING ABDULLAH FINANCIAL DISTRICT (CP-04B MEP WORKS FOR PARCEL 2.08, 2.09 AND 2.12)Client: KAFD Contractor: Saudi Arabian Baytur Engineer: Dar Al Handasah Scope ofWork: ‣ Survey on installed MEP systems & status ‣ Reporting on the pending works for full operation of MEP systems ‣ Supply and Installation of complete MEP Works: ‣ HVAC ‣ Fire fighting ‣ Electrical ‣ Low Current |
Ongoing
Projects

Ongoing Projects
![]() MINISTRY OF DEFENSE - OF ACADEMY BUILDING NO 4 & 5Client: Ministry of Defense Contractor: ICAD Scope of Work: Supply, Installation of: ‣ HVAC System –(Ducting, Exhaust fans, FAHUs and FCUs) ‣ Plumbing Works –(Drainage System, Hot and Cold water system, Pumps, Sanitary Fixtures, EWH) ‣ Fire fighting Works –(Piping, Sprinklers, Fire extinguishers, Fire hose cabinets) ‣ Electrical Works –(Lighting fixtures, switches, panels, cables) ‣ Civil Works –(Blockwork, Plastering, Terazzo, Painting works, Gypsum Boards, Doors and Windows) | ![]() SECURITY FORCES MEDICAL CENTERClient: Ministry of Interior Contractor: ABV Rock Consultant: Manens - Tifs Scope of Work: ‣ Supply and installation of first and second fix items, installation, testing and commissioning of the long lead equipment supplied by Main contractor ‣ All related MEP Works inside Utility Chillers Building ‣ District Cooling System along with all related Infrastructure works. ‣ We are the lead MEP Contractor coordinating all the activities of MEP Work along side with architecture, structure | ![]() VIA RIYADHClient: SELA Contractor: MBL Consultants: : Dar Al Omran Consultants Scope of Work: Supply, Installation of: ‣ HVAC System ‣ Fire fighting Works ‣ Plumbing Works ‣ Electrical Works ‣ LPG System Network | ![]() BOULEVARD EXPANSIONClient: SELA Consultants: Khatib and Alami Scope of Work: Supply, Installation of: ‣ Drainage network, water network, fire network, irrigation network, water tank and pumps ‣ Civil works |
---|---|---|---|
![]() MASHAREF - PROJECT 2Client: Kinan Contractor: Huta Consultant: Arabtech Jardaneh Scope ofWork: MEP Works for Potable Water, Street Lighting and MV Networks, Infrastructure Works ‣ Supply & Installation of StreetLighting ‣ Supply & Installation of Power Network ‣ Supply & Installation of Potable water systems ‣ Supply & Installation of Fire fighting works | ![]() WEST PIER - FACILITIES UPGRADE RAS TANURAClient: ARAMCO Contractor: Huta Engineer: Mustang Al Hejailan Scope ofWork: ‣ Diesel loading pump / Diesel System Oily water collection & treatment system Drinking water system ‣ Fire water system Compressed air system ‣ Transformers, switch rack and panel boards Wires, cables, conduits and cable trays Lighting system ‣ Cathodic protection ‣ Coordination & tie-in with instrumentation works and existing utilities | ![]() KING KHALID INTERNATIONAL AIRPORTClient: Riyadh Airports Company Contractor: Riyadh Airports Company Consultant: Egis Projacs Scope ofWork: Internal Works (Tunnels) and ExternalWorks: Design and Build Contract of : ‣ Potable water system (pipes, fittings, valves and accessories) ‣ Fire fighting system (pipes, fittings, valves and accessories) ‣ SCADA System ‣ Civil works (trial pits ,utilities detection, radar mapping, concrete works, excavation and backfilling works) | ![]() ALMOOSA REHAB AND LTC FACILITYClient: Al Moosa Specialist Hospital Contractor: First Fix Engineer: Al Moosa Specialist Hospital Scope ofWork: Supply, Installation, Testing and commissioning of all MEP Works inside the three buildings mentioned below: ‣ CUP Building – 3 Floors (Chilled Water Plant ) ‣ INPATIENT Building – 16 Floors ‣ OUTPATIENT Building – 4 Floors |
![]() NEW JEDDAH DOWNTOWN - JCDClient: MBL Contractor: MBL Scope of Work: Supply, Installation, Testing and commissioning of: ‣ Infrastructure works ‣ Mechanical Works including ‣ Buildings, Diversion works and Demolition works ‣ Electrical Works including ‣ Buildings, Diversion works and Substation works | ![]() UMMAHAT ALSHAYKH HOTEL #12Client: Red Sea Development Company Contractor: Red Sea Development Company Scope of Work: Supply, Installation of MEP works in : Sitewide Infrastructure ‣ Wet Services Works ‣ Dry Services Works Building MEP & Testing & Commissioning ‣ Wet Services Works Execution ‣ Dry Services Works Execution | ![]() HEGRA BOUTIQUE HOTEL - ALULAClient: MBL Contractor: MBL Scope of Work: Supply, Installation, Testing and commissioning of: ‣ Fire Fighting System ‣ Plumbing Systems ‣ HVAC Systems ‣ Swimming Pool Works ‣ Power Distribution Works ‣ Lighting Fixtures ‣ External Works | ![]() KING ABDULLAH FINANCIAL DISTRICTClient: KAFD Consultants: Ashbelya Consulting Scope of Work: Supply, Installation of: ‣ Civil Works ‣ Landscaping works ‣ Irrigation works ‣ Street and Hardscaping works ‣ Electrical and Cables supply |
![]() KING SALMAN PARK - ROYAL ARTS COMPLEXClient: KSP Contractor: MBL Scope of Work: Supply and Installation of all MEP and Infrastructure Works: Wet Services works Execution ‣ Mechanical: HVAC works. ‣ Electrical: All electrical works, fire alarm system, telephone system, BMS, LV system. ‣ Plumbing: Drainage system, water supply distributions, sanitary ware installations and related works. ‣ Fire Fighting System: Sprinkler system, firefighting equipment’s, clean agent FM200 system, etc. |
bottom of page